How do we work?
Before the start of the work, any obstacles in your stable should be removed as much as possible. Caked manure should be removed up to knee height from the walls and box edges to allow for a straight line to begin. For the execution of the work, water and power supply are needed. These connections should be within 100 meters from the location where you wish to have the concrete and/or stable floor roughened.
How are my cows/livestock doing? We will make an assessment at the start regarding the times when you can move the livestock, in order to disturb the daily rhythm of the cows as little as possible. We hope to meet you and your cows soon!